Canning Town Flyover
Structural refurbishment works on flyover
The A13 Thames Gateway DBFO contract was completed by the Road Management Services (RMS) consortium and transferred to TfL in 2000.
As part of the project in East London , there was a requirement to carry-out works to the Canning Town Flyover.
As subcontractor to the TfL area Term Maintenance Contractor Topbond were tasked with works which included edge protection and the removal of existing and re-installation of new parapet plinths along the entire structure.
View the embedded image gallery online at:
https://www.topbond.co.uk/topbond/canning-town-flyover.html#sigProId00bbb8c04d
https://www.topbond.co.uk/topbond/canning-town-flyover.html#sigProId00bbb8c04d