Crossrail header

Canary Wharf Crossrail Station, part of a new rail line opening in 2018, is currently being constructed adjacent to buildings including the HSBC tower.

Topbond were commissioned to produce and supply seven sections of retaining wall to make up a cascading water feature at the Canary Wharf Shopping Centre in mid-2015.

Each of the seven sections had to fit precisely between the new bason walls, measuring three metres wide by one metre deep. They were designed in conjunction with existing architects plans but modified through the design phase.

The final designs included stainless steel plates, over which the water can drop 200mm to the next section.

For further information contact Broadmead Renaissance Cast Stone on 01795 414050
E-Mail: This email address is being protected from spambots. You need JavaScript enabled to view it.