Topbond Group PLC

Today is: 05/07/2008
  Homepage - Recent Projects - A1 Great Northway Bridges

Project: Two temporary foot and services bridges

A1 Great Northway Bridges A1 Great Northway Bridges
Click on thumbnails for a larger view
As part of the replacement of edge beams on the existing bridge carrying the A1 across a river, Intaspan were commissioned to design, fabricate and erect two temporary foot and services bridges to divert the footpath and services from the existing bridge.


The new structures consist of a 28m and a 14m span steel bridge with timber decks on either side of the existing bridge. Installation required a road closure, so the bridges were installed on a Saturday to minimise disruption.


For further information contact Intaspan on 01795 414050
email sales@topbond.co.uk

 
Graphic and website design - High Profile Ltd, Kent