Warning: mysql_num_rows(): supplied argument is not a valid MySQL result resource in /usr/home/tbond/public_html/routines/dbAccess_mysql.php on line 108
Topbond PLC Group > Flitchway Bridge
Topbond Group PLC

Today is: 11/10/2008
  Homepage - Structural Repair & Refurbishment - Flitchway Bridge

Project: Repairs to Brick arch railway bridge

Flitchway Bridge Flitchway Bridge
Click on thumbnails for a larger view
This damaged disused railway bridge was repaired using a system of helical stainless steel masonry reinforcement. The repair was carried-out by Hydra Technical Services, a division of Topbond plc Group.

HTS completed the works to a bespoke design approved by Mouchel Parkman to take the bridge up to its original design loading, although traffic will now be mostly pedestrian when the railway line is re-opened as a footpath. Offered as a total service solution, the repair is warranted against failure of design, materials, and installation.


For further information contact HTS on 01652 640620
email sales@topbond.co.uk

 
Graphic and website design - High Profile Ltd, Kent