Warning: mysql_num_rows(): supplied argument is not a valid MySQL result resource in /usr/home/tbond/public_html/routines/dbAccess_mysql.php on line 108
Topbond PLC Group > Abridge Bridge Refurbishment
Topbond Group PLC

Today is: 14/10/2008
  Homepage - Recent Projects - Abridge Bridge Refurbishment

Project: Repairs and painting to station facade

Abridge Bridge Refurbishment Abridge Bridge Refurbishment
Click on thumbnails for a larger view
The brick bridge over the River Roding at Abridge in Essex was in poor condition, but as a Grade II listed structure it was necessary to find a solution which would be both functional and aesthetic.

CINTEC anchors were selected to strengthen the bridge. These work by means of a special ‘sock’ which is inserted into holes diamond drilled into the brickwork. These ‘socks’ are then injected with grout which expands and seeps into any voids, providing a very strong bond.

As approved applicators of this system, Topbond installed the CINTEC anchors, working from boats to gain access.

To provide further support, Topbond also installed 20mm diameter tie bars and patress plates.

Finally, Topbond carried out brickwork and masonry repairs to the bridge.


For further information contact Topbond on 01795 414050
email sales@topbond.co.uk

 
Graphic and website design - High Profile Ltd, Kent