Warning: mysql_num_rows(): supplied argument is not a valid MySQL result resource in /usr/home/tbond/public_html/routines/dbAccess_mysql.php on line 108
Topbond PLC Group > River Crane and Chiswick Bridges
Topbond Group PLC

Today is: 11/10/2008
  Homepage - Structural Repair & Refurbishment - River Crane and Chiswick Bridges

Project: Repair, casting and installation of Masonry Bridge Parapets

River Crane and Chiswick Bridges River Crane and Chiswick Bridges
Click on thumbnails for a larger view
The damage caused to bridge parapets from Road Traffic Accidents can pose additional headaches when hard-to-replace masonry work is affected. This is particularly so if the structure is Listed.

Topbond’s expertise in this type of repair is based on two key capabilities: years of bridge repairs experience coupled with the services of the Broadmead Renaissance Cast Stone division. Although primarily used for bespoke new build and heritage projects Broadmead Renaissance Cast Stone skills are equally useful in the replacement of stonework where difficult section designs are required to be matched.

The examples illustrated are River Crane Bridge, Twickenham and Chiswick Bridge, London. River Crane Bridge was designed to include multiple balustrade units cast into a longer section of coping to reduce costs in production and speed on-site installation. Chiswick Bridge was repaired using individual units by copying the design of the originals and refitting along with undamaged units where possible.



For further information contact Topbond on 01795 414050
email sales@topbond.co.uk

 
Graphic and website design - High Profile Ltd, Kent