Warning: mysql_num_rows(): supplied argument is not a valid MySQL result resource in /usr/home/tbond/public_html/routines/dbAccess_mysql.php on line 108
Topbond PLC Group > BT Tower Swansea
Topbond Group PLC

Today is: 13/10/2008
  Homepage - Recent Projects - BT Tower Swansea

Project: Abseiling Inspection

BT Tower Swansea BT Tower Swansea
Click on thumbnails for a larger view
Hydra Technical Services (HTS) were commissioned by Kendall Kingscott Partnership to carry-out a survey of an 11 storey building in the centre of Swansea as part of their BT facilities contract.

The aim of the survey was to determine the current condition of the external fabric of the concrete elements cladding the tower.

Due to the size and location of the tower HTS deployed an abseiling team to undertake the survey.

The survey had to be undertaken whilst access to the building and the public footpaths remained open.

HTS produced a report on the survey and associated laboratory testing of samples collected by the abseil team. The final report included CAD drawings and a repair specification.

For further information contact HTS on 01652 640620
email sales@topbond.co.uk

 
Graphic and website design - High Profile Ltd, Kent