Warning: mysql_num_rows(): supplied argument is not a valid MySQL result resource in /usr/home/tbond/public_html/routines/dbAccess_mysql.php on line 108 Topbond PLC Group > Wallbridge Footbridge
All steel warren truss footbridge - Frome, Somerset
Wallbridge Footbridge
Click on thumbnails for a larger view
Intaspan were asked by Bellway Homes to design and install a bridge to link a housing development which they were building on both sides of the river at Frome in Somerset.
The chosen design was an all-steel warren truss bridge, 25m in length and 3m wide, with 80m of connecting ramps.
The bridge is finished with grey anti-skid surfacing.
For further information contact Intaspan on 01795 414050 email sales@topbond.co.uk
This site and all contents are (C) 2008 Topbond PLC Group
Email: sales@topbond.co.uk Telephone: 01795 414050