Warning: mysql_num_rows(): supplied argument is not a valid MySQL result resource in /usr/home/tbond/public_html/routines/dbAccess_mysql.php on line 108
Topbond PLC Group > Wallbridge Footbridge
Topbond Group PLC

Today is: 14/10/2008
  Homepage - Recent Projects - Wallbridge Footbridge

Project: All steel warren truss footbridge - Frome, Somerset

Wallbridge Footbridge Wallbridge Footbridge
Click on thumbnails for a larger view
Intaspan were asked by Bellway Homes to design and install a bridge to link a housing development which they were building on both sides of the river at Frome in Somerset.

The chosen design was an all-steel warren truss bridge, 25m in length and 3m wide, with 80m of connecting ramps.

The bridge is finished with grey anti-skid surfacing.

For further information contact Intaspan on 01795 414050
email sales@topbond.co.uk

 
Graphic and website design - High Profile Ltd, Kent