Design and build of steel footbridge and ramps - Barking, Essex
Fresh Wharf Footbridge
Click on thumbnails for a larger view
In 2003 Intaspan were invited to tender for the design and construction of a footbridge to provide access across the A406 road at Barking to a new retail and commercial development which was under construction.
Intaspan was awarded the contract to carry out the full design and build package for the sub– and super-structure.
The structure is made of a fully steel deck on a series of Precast concrete columns, sitting on piled foundations. The main span is 28m with associated ramps totaling 117m. The deck surfaces are coated with anti-skid surfacing to provide a safe and durable finish to the structure.
For further information contact Intaspan on 01795 414050 email sales@topbond.co.uk
This site and all contents are (C) 2009 Topbond PLC Group
Email: sales@topbond.co.uk Telephone: 01795 414050